| Project Name | Location | Case Type | Description |
| Oregon Park Negative Declaration | 4951 Oregon Avenue | ND 04-10 | The City of Long Beach Parks, Recreation and Marine Department intends to develop the 3.3-acre lot with a neighborhood park. Proposed improvements would include a regulation soccer field with lights, a tot lot, group picnic area, walking path and prefabricated restrooms. A total of 42 parking spaces would be added and a portion of the public right of way and Los Angeles flood channel would be landscaped with drought tolerant trees and shrubs. |
| Aquarium of the Pacific "Pacific Visions" Expansion Negative Declaration | 100 Aquarium Way | ND 01-10 | The proposed project involves construction of a 23,330-square foot addition (14% floor area increase) to an existing 166,447-square foot aquarium facility. The project consists of a new wing with a “media-based chamber,” an expanded retail store, and a new front entrance. The Aquarium’s total ground lease area is 276,371 square feet (6.34 acres). The project will be designed and built to the USGBC’s LEED Gold standards with “add-alternate” design plans to bring the project to Platinum status if funding is available. |
| 925 East PCH Lease Acquisition Project Mitigated Negative Declaration | 925-945 East Pacific Coast Highway | ND | The proposed project involves acquisition of a lease on the Redevelopment Agency-owned property located at 925-945 E. Pacific Coast Highway. The lease, which expires on March 11, 2013, would be acquired by the Redevelopment Agency through negotiated agreement, or upon determination by the Redevelopment Agency, by eminent domain. The project also involves demolition or rehabilitation of the existing project site building for the purposes of blight removal. |
| 2nd+PCH Draft EIR; Appendices A-I; Appendix J; Appendix K | 6400 East Pacific Coast Highway | EIR | The proposed project would include the demolition of existing on-site uses and would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space. |
| Downtown Community Plan Notice of Preparation | Bounded by Los Angeles River on the west; Ocean Boulevard on the south; generally follows portions of 7th and 10th Streets on the north; and land on both sides of Alamitos Avenue on the east. May be expanded to include 33-acre area south of 10th Street. | NOP | The project is the adoption and implementation of the proposed Long Beach Downtown Community Plan (DTCP), which would replace the existing PD-30 planned development ordinance for the DTCP area. The proposed DTCP would incorporate zoning, development standards, and design guidelines to establish design and development criteria to guide new development that would be consistent with the community vision for the Downtown. |
| Historic Preservation Element Notice of Intent to Adopt and Negative Declaration | Citywide | ND | This Historic Preservation Element is intended to better integrate historic preservation into City procedures and interdepartmental decisions, and to create a meaningful partnership with the community in order to implement the City’s historic preservation program. As set forth in the Vision Statement, the Historic Preservation Element is intended to ensure that the rich history of Long Beach is preserved through the identification, protection, and celebration of its historic resources which are valued for their role in the City’s environment, urban design, economic prosperity, and contributions to the quality of life in its neighborhoods. The Historic Preservation Element establishes the goals, policies and implementation measures that affirm the City’s commitment to historic preservation. |
| Golden Shore Master Plan Final EIR | Bounded by Ocean Blvd. to the N, Shoreline Dr. to the W and S, and parking lots associated with Arco Center to the E, with Golden Shore transecting the site from N to S. | EIR | The proposed project would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space. The project includes three development options, a Residential Option and two Hotel Options, all of which would be entitled through the City of Long Beach. The option ultimately constructed would be selected based on market conditions prevailing at the time entitlement is complete. |
| Fresh & Easy Neighborhood Market Notice of Intent to Adopt and Initial Study | 3300 Atlantic Ave. | IS | The project site consists of ten lots on 1.38 acres: five located in the City of Long Beach and five in the City of Signal Hill. The five lots located in Long Beach total 30,198 square feet and are located on the east side of Atlantic Avenue and north of East 33rd Street at 3300 Atlantic Avenue. The applicant is proposing to construct a new single-story, 14,304 square-foot Fresh & Easy Neighborhood Market with 17 parking spaces north of the building on the .69-acre Long Beach site. Two accessory parking lots, separated from the market by a 20’ wide alley and containing a total of 52 parking stalls, comprise the remaining project acreage and lie within the City of Signal Hill. The lots in Signal Hill consist of a 100’ wide x 120’ deep parcel and a 150’ wide x 120’ deep parcel separated by 100’. Both of these lots will be improved as open parking lots for the retail use. The parking lots also contain a trash enclosure, transformer, and cart corral. |
| Studebaker LB, LLC Tank Removal Project Notice of Intent to Adopt and Revised Mitigated Negative Declaration | 400 N. Studebaker Rd. | ND | The project site is a nearly rectangular shaped 17.8 acre parcel located on the east side of Studebaker Road at the Loynes Drive/Studebaker Road intersection. The project site contains six above-ground storage tanks (ASTs), conveyance pipelines, and containment berms. The four large ASTs (tanks Nos. 1,2,3,4) originally stored Fuel Oil No. 6, which formerly fueled the adjacent power plant. The remaining smaller ASTs (cutter tank Nos. 1 and 2) have been used to store distilled oil. The tanks are surrounded by a berm system originally constructed to contain any tank spills. There are no existing occupants or land uses on the site. |
| Ramona Park Senior Apartments Negative Declaration and Historic Resource Assessment Part 1, Part 2, Part 3, Part 4, Part 5 and Part 6 | 3290 and 3232 Artesia Blvd. | ND | The proposed project is an affordable senior apartment complex for seniors 55 years and older. The proposed three-story building will consist of 61 residential units, including 49 one-bedroom units, 11 two-bedroom units, and one three-bedroom managers unit. Amenities will include a large central courtyard, a pool, spa, fire pit, picnic area, exercise room, community rooms, classroom and recreation rooms. A second parcel, APN#7120-003-033, is included in the project and currently exhibits the Windsor Gardens Convalescent Center at 3232 East Artesia. This parcel will only undergo a general plan amendment and zone change as part of the proposed project. |
| Art Exchange Draft EIR and Appendices Part 1, Part 2, Part 3 & Part 4 | 240-256 Long Beach Blvd. | EIR | The Art Exchange is intended to provide a permanent and affordable workplace for the development and production of art by local artists. The Exchange would operate on a profit-centered business model where artists sell directly to the public and are connected to networking opportunities that would help promote an art community for the City. Project components include artist studios, multipurpose/classroom space, hot shop for glass and ceramics production, a centrally located open courtyard, gallery space, office, and service areas. |
| Studebaker LB, LLC Tank Removal Project Mitigated Negative Declaration | 400 N. Studebaker Rd. | ND | The project site is a nearly rectangular shaped 17.8 acre parcel located on the east side of Studebaker Road at the Loynes Drive/Studebaker Road intersection. The project site contains six above-ground storage tanks (ASTs), conveyance pipelines, and containment berms. The four large ASTs (tanks Nos. 1,2,3,4) originally stored Fuel Oil No. 6, which formerly fueled the adjacent power plant. The remaining smaller ASTs (cutter tank Nos. 1 and 2) have been used to store distilled oil. The tanks are surrounded by a berm system originally constructed to contain any tank spills. There are no existing occupants or land uses on the site. |
| Golden Shore Master Plan Draft EIR | Bounded by Ocean Blvd. to the N, Shoreline Dr. to the W and S, and parking lots associated with Arco Center to the E, with Golden Shore transecting the site from N to S. | EIR | The proposed project would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space. The project includes three development options, a Residential Option and two Hotel Options, all of which would be entitled through the City of Long Beach. The option ultimately constructed would be selected based on market conditions prevailing at the time entitlement is complete. |
| Alamitos Bay Marina Final EIR | SE portion of LA County within City of Long Beach. Adjacent and NW of San Gabriel River mouth. | EIR | The City is the Lead Agency for the project and will prepare the EIR in accordance with the requirements of CEQA and the State CEQA Guidelines. In early 2008, the City prepared an Initial Study/Mitigated Negative Declaration (IS/MND) for the Alamitos Bay Marina Rehabilitation Project. Mitigation measures to reduce potentially significant effects to less than significant levels were incorporated into the project, and the IS/MND was circulated for public review from April 4, 2008 to May 5, 2008. Comments were received from reviewing agencies and issues were raised in the comments received that have yet to be resolved. Therefore, due to and abundance of caution, the City has elected to elevate the level of CEQA review to an EIR. |
Second + PCH Notice of Preparation, Initial Study & Scoping Meeting Presentation | Southeast corner of Second Street and Pacific Coast Highway | NOP/IS | The proposed project would include the demolition of existing on-site uses and would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space. |
| Bahia Marina | 6289 E. Pacific Coast Highway | ND 08-09 | The proposed project involves maintenance dredging for the Cerritos Bahia Marina to maintain sufficient water depth for marina operations. The proposed dredge depth for the project is –6 feet mean lower low water (mllw) with an allowable over dredge of +2 feet. The volume of material to be removed is 26,867 cubic yards (cy). A volume of 11,086 cy is available to –6 feet (mllw) and 15,781 cy is available in the +2 foot over dredge volume. |
North Village Center Final EIR Draft EIR Part 1, Part 2, Part 3, and Part 4 Appendix Part 1, Part 2, Part 3, and Part 4 | Bounded by South St., Linden Ave., 59th St., and Lime Ave. | EIR 01-08 | The proposed project involves the redevelopment of an approximately 6.3-acre site in the City of Long Beach with a mixed-use “village center” project. This section describes the project location, characteristics of the site and the proposed development, project objectives, and the approvals needed to implement the project. |
Kroc Community Center Final EIR, Findings of Fact & Statement of Overriding Considerations, Mitigation Monitoring Program | Hamilton Bowl / Chittick Field, 1900 Walnut Ave. | Final EIR | The reformation of up to 19 acres of land designated by the Salvation Army, through a grant from the Kroc Foundation, for the location of a new recreation and community center to foster and serve the recreational needs of the local community. |
| Art Exchange | 240-256 Long Beach Blvd. | EIR 02-09 | The Art Exchange is intended to provide a permanent and affordable workplace for the development and production of art by local artists. The Exchange would operate on a profit-centered business model where artists sell directly to the public and are connected to networking opportunities that would help promote an art community for the City. |
| Hotel Sierra | 290 Bay Street | EIR 01-09 | This is an addendum to the Supplemental EIR 14-04 for the Pike at Rainbow Harbor project. This project consists of a new 5-story 125-room hotel with approximately 15,000 square feet of ground floor retail space, to be located at 290 Bay Street. Parking is to be provided at the 2,211-space Pike parking structure. |
| Alamitos Bay Marina | SE portion of LA county within City of LB. Adjacent and NW of San Gabriel River mouth. | NOP | The City is the Lead Agency for the project and will prepare the EIR in accordance with the requirements of CEQA and the State CEQA Guidelines. In early 2008, the City prepared an Initial Study/Mitigated Negative Declaration (IS/MND) for the Alamitos Bay Marina Rehabilitation Project. Mitigation measures to reduce potentially significant effects to less than significant levels were incorporated into the project, and the IS/MND was circulated for public review from April 4, 2008 to May 5, 2008. Comments were received from reviewing agencies and issues were raised in the comments received that have yet to be resolved. Therefore, due to and abundance of caution, the City has elected to elevate the level of CEQA review to an EIR. |
Kroc Community Center Volume 1: Part 1, Part 2, Part 3, Part 4 Volume 2: Part 1, Part 2, Part 3, Part 4 | Hamilton Bowl / Chittick Field, 1900 Walnut Ave. | Draft EIR | The reformation of up to 19 acres of land designated by the Salvation Army, through a grant from the Kroc Foundation, for the location of a new recreation and community center to foster and serve the recreational needs of the local community. |
| 1235 Long Beach Blvd. Mixed-Use Project | S of Anaheim St. & N of 12th St., between Locust Ave. & Long Beach Blvd. | Addendum | The proposed project would include demolition of existing on-site uses and construction of a mixed-use (transit oriented) development that includes the construction of 3 buildings consisting of 170 residential condominium units, 186 senior (age-restricted) apartment units, and 42,000 sq. ft. of retail/restaurant floor area. |
| Golden Shore Master Plan | Bounded by Ocean Blvd. to the N, Shoreline Dr. to the W and S, and parking lots associated with Arco Center to the E, with Golden Shore transecting the site from N to S. | NOP | The proposed project would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space. The project includes two development options, a Residential Option and a Hotel Option, both of which would be entitled through the City of Long Beach. However, only one option would be ultimately constructed based on market conditions prevailing at the time entitlement is complete. |
| Colorado Lagoon Restoration Project Final EIR | SE portion of LB, NW of San Gabriel River mouth, and upstream fr Marine Stadium & Alamitos Bay. | EIR 30-07 | The primary goals of the proposed project are to: (1) create habitat that can successfully establish and support native plant and animal communities in the long term, (2) implement long-term water quality control measures, and (3) enhance the Lagoon’s value as a recreational resource. The proposed project provides a framework to coordinate these various and potentially competing interests. |
Douglas Park Rezone Project Addendum to Final EIR Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G CEQA Findings | Douglas Park Rezone Project | | Appendix A - Air Quality Appendix B - Drainage Appendix C - SUSMP Appendix D - Reclaimed Water Appendix E - Sewer Technical Study Appendix F - Traffic Memoranda Appendix G - FAA Determinations CEQA Findings and MMRP |
| North Village Center Redevelopment Project: Notice of Preparation & Initial Study | 2 full blocks on the E & W sides of Atlantic, N of South St. | NOP/IS | Construction of up to 180 units of multi-family housing in a mix of row houses, courtyard units and units built atop ground floor non-residential space. The project also includes up to 50,000 sq. ft. of neighborhood-serving commercial/retail space, a public library and community center totaling approximately 30,000 sq. ft., and approximately 600 off-street parking spaces in private garages, surface parking lots and an above-ground parking structure. |
| Rancho Dominguez Annexation | Rancho Dominguez Industrial Area | ND 18-06 | Annexation of approx. 880 acres of the unincorporated LA County Rancho Dominguez area, which is generally bounded by Alameda St. on the west, the 91 fwy. on the north, the City of LB corporate boundary on the east and Del Amo Blvd. on the south. The industrially developed acreage contains approx. 189 structures on 279 parcels of land. |
| Ocean Blvd. Project | 1628-1724 Ocean Blvd. | ND 10-09 | The proposed project would include the demolition of existing structures, the development of 51 condominium units and the remodel of an existing building to maintain 11 motel units. The residential development would be four stories in height above street level and would have two levels of subterranean parking. Vehicular access to the subterranean garage would be from 11th Place and Bluff Place. The demolition and construction activities are estimated to take approximately 18 months from commencement of work. |
Aquarium of the Pacific Facility Enhancement Project: Part 1 & Part 2 | 100 Aquarium Way | ND 14-06 | The Aquarium of the Pacific proposes (1) to construct 5,300 sq. ft. of LEED Platinum-certified indoor facilities & 13,800 sq. ft. of outdoor, fabric-shaded exhibit area at the rear of its existing campus ("proposed South Lease area") and (2) to relocate its current aviary exhibit to the same parcel. |