Environmental Reports
Environmental Review Application Fee Schedules CEQA Process Flowchart Environmental Planning

Environmental Planning (562) 570-6458

Case Key

EIR = Environmental Impact Report
IS = Initial Study
ND = Negative Declaration
NOA = Notice of Availability
NOP = Notice of Preparation

Project Name Location Case Type Description
Riverwalk Residential Development Project  

Draft Initial Study of Preparation
Notice of Preparation
                                          

The project site is located at 4747 Daisy Avenue, south of 48th Street, north of the Virginia Country Club and east of the Los Angeles River.

IS
NOP

The proposed Riverwalk Residential Development Project site is 10.56 acres. The project site was formerly the Will J. Reid Boy Scout Camp, but is no longer used by the Boy Scouts and is currently vacant. The proposed project would involve subdividing the project site and developing it into a gated residential community containing 131 detached single family homes on lots with a minimum square footage of 2,400 square feet. The proposed homes would be a mixture of 2 and 3-story homes with a maximum height of 35’6".

Long Beach Courthouse Demolition

LB Courthouse Draft EIR
LB Courthouse NOA
LB Courthouse Initial Study
LB Courthouse NOP

Appendix A - NOP, IS & NOP Comments
Appendix B - Demolition Plan
Appendix C - Air Quality
Appendix D - Cultural Resource Study
Appendix E - Paleo Impact Report
Appendix F - Noise
Appendix G - Traffic Impact Study
Appendix H - Adaptive Reuse Study

The project site is located at 415 West Ocean Boulevard at the northeast corner of Ocean Boulevard and Magnolia Avenue in downtown Long Beach, California. The 151,200-square-foot project site is located within the block bounded by Broadway to the north, Chestnut Place to the east, Ocean Boulevard to the south, and Magnolia Avenue to the west.

EIR
NOA
IS
NOP

The proposed project consists of the demolition of the former Long Beach Courthouse building and would entail the removal of reinforced concrete, structural steel, siding, glass, and other building materials from the project site. Following completion of the demolition activities, the project site would be secured with a fence to prevent unauthorized individuals from entering the project site. While development of the project site in the future is likely, at this time, no firm plans for the project site have reached the level of a proposed or reasonably foreseeable project.

PCH & 2nd

PCH & 2nd Project Initial Study
PCH & 2nd NOP

6400 E. Pacific Coast Highway (bounded by 2nd Street to the north, Pacific Coast Highway to the east, a retail shopping center (Marina Shores Shopping Center) to the south, and Marina Drive to the west.

IS
NOP
The proposed project involves demolition of the existing Seaport Marina Hotel and construction of a commercial center totaling 245,000 square feet (216,000 square feet of retail space and 29,000 square feet of restaurant space) and 1,172 on-site parking spaces (1,044 space three-level parking structure and 128 surface parking spaces).  The proposed commercial structures would be one- and two-story buildings with a maximum height of 35 feet.
Pacific Pointe East

Final Environmental Impact Report
Pacific Pointe East NOA
Draft Environmental Impact Report
Pacific Pointe East Initial Study
Pacific Pointe East NOP

Southeast corner of Lakewood Boulevard and Conant Street near the Long Beach Airport

IS
NOP
The proposed project involves construction of three industrial buildings on a site currently improved as a paved surface parking lot.  These buildings would have an open floor plan and are intended for light industrial, light manufacturing, warehouse, office, and/or research and development land uses. 
CSULB Foundation Retail Project

CSULB Foundation Retail Final EIR
NOA Signed Final
Cover Page and Master TOC
1.0 Executive Summary
2.0 Introduction
3.0 Project Description
4.0 Existing Environmental Setting
4.1 Aesthetics
4.2 Air Quality
4.3 Biological Resources
4.4 Cultural Resources
4.5 Geology
4.6 GCC
4.7 Hazards
4.8 Hydrology and Water Quality
4.9 Land Use
4.10 Noise
4.11 Population, Housing, and Employment
4.12 Public Services
4.13 Transportation and Circulation
4.14 Utilities
5.0 Alternatives
6.0 Long-Term Implications
7.0 MMRP
8.0 List of Preparers and Persons Contacted
9.0 References

Appendix A ISNOP and NOP Comments
Initial Study Final
NOP Comments:
Caltrans
Century Villages at Cabrillo
DTSC
Johntommy Rosas
LA County DPW
Metro
NAHC
Sanitation District
SCAQMD

Appendix B Urban Decay Study
CSULB Foundation Urban Decay Study

Appendix C Air Quality
Air Quality Analysis

Appendix D Biological Resources
Biological Resources Assessment

Appendix E Archeo, Paleo, and Historic Resources
Archaeological Report
Historic Resources Report
Paleontological Resources Assessment CSULB Foundation Project June-2013

Appendix F Geotechnical
Geotechnical_Report_-_02-28-12

Appendix G Phase I ESA
Letter to Craig Chalfant on the Sea Bright Motel Site - 12-11-13
PHASE 1 ESA - CSULB Long Beach
Phase I ESA REC Emails

Appendix H Hydrology and Water Quality
CSULB_Retail_Project_Hydrology_Report
Long_Beach-Retail-LID-SUSMP(2)

Appendix I Noise
Noise Report

Appendix J Public Service and Utilities Questionnaires
Fire
Email Response_Steve Raganold_ Received 9-16-13
LBFD Response_David Zinnen_Received 8-14-13
LBFD sent Letter

Police
LBPD Response_ Julie Bedard_Received 11-8-13
LBPD sent Letter

Wastewater
LACSD Response_Adriana Raza_Received 7-25-13
LACSD sent Letter

Water
LBWD Response _David Santos_Received 8-29-13
LBWD sent Letter

Appendix K Traffic
Traffic Study
 

 

The project site is located at 1645 W. Pacific Coast Highway (PCH), bounded by 19th Street to the north, Cota Avenue to the east, PCH to the south, and Technology Park to the west.

IS
NOP
Technical Appendices
 

 

This project proposes the demolition of the existing buildings and carports on the site and construction of a new single story building for retail use that would be up to 122,500 square feet in size with 490 on-site parking spaces. The proposed retail building would have a maximum height of 32 feet and could be used by a single retail tenant or by two tenants with separate (side-by-side) entrances.

LB East Division Police Substation

LB Police Station Substation Draft ISMND

A_AQ_GHG Data
B_Historic Resource Report
C_Env Conditions of Property Report
D_Noise Data
E_Structural Seismic Risk Assessment

The proposed East Division Police Substation (herein referenced as the “project”) is located at 3800 E. Willow Street (between Redondo Avenue and Lakewood Boulevard), and would involve the transfer of the Schroeder Hall property (owned by the U.S. Department of Defense) to the City of Long Beach for relocation of the existing East Division Police Substation and Juvenile Investigations Section.

IS
ND
Technical Appendices
Following a preliminary review of the proposed project, the City of Long Beach determined that the improvements are subject to the guidelines and regulations of the California Environmental Quality Act (CEQA). The City has determined an Initial Study/Mitigated Negative Declaration (IS/MND) to be the appropriate level of environmental analysis under the provisions of CEQA. As the City is seeking a transfer of land under the Base Realignment and Closure (BRAC) program (or a transition of surplus military property to civilian uses), the proposed project is also subject to environmental review under the National Environmental Policy Act (NEPA) (implementation of which is reviewed and approved by the U.S. Department of the Army). NEPA documentation associated with the proposed project will be processed by the Department of the Army under separate cover.

2810 East 1st Street

Sec 00_Table of Contents
Sec 01_Executive Summary
Sec 02_Introduction
Sec 03_Project Description
Sec 04_Cumulative
Sec 05-00_Environmental Analysis
Sec 05-01_Cultural Resources
Sec 06_Other CEQA Considerations
Sec 07_Alternatives
Sec 08_EFNTBS
Sec 09_Significant Environmental Effects
Sec 10_References

Appendix A_IS and NOP Comment Letters
Appendix B_Historical Resource Report
Appendix C_Historic Structure Report LSA

The proposed 2018 East 1st Street Project (herein referenced as the “Project”) islocated north of Ocean Boulevard, between Temple Avenue and Orizaba Avenue, within LongBeach’s Bluff Park Historic District.

IS
NOP
The residence located at 2810 East 1st Street was originally constructed in 1921. In 1982, the Bluff Park Historic District was designated with the 2810 East 1st Street residence identified as a contributing structure. On October 15, 2005, a Certificate of Appropriateness was approved allowing a 523-square foot addition and removal of the rough-textured stucco on the existing residential structure. In December 2005, permitted construction work was initiated. Upon removal of the rough-textured stucco, most of the lath detached from the framing, leaving the framing bare. Termite damage and dry rot in the framing were also discovered during the stucco removal. The former property owner notified the City and requested a Certificate of Appropriateness for demolition and new construction. Since 2005, the residence has remained in its current state.
Mobility Element

Notice of Intent to Adopt a Negative Declaration

Negative Declaration
City of Long Beach, County of Los Angeles, California ND The Mobility Element focuses on the circulation component of the City of Long Beach General Plan and will replace the adopted 1991 Transportation Element.  Compared to the current Transportation Element, the proposed update places more emphasis on pedestrian, bicycling and public transit options, and transformative infrastructure prepared in compliance with the 2008 Complete Streets Act (Assembly Bill 1358), which mandates that circulation elements to include concepts for a balanced, multimodal transportation network that meets the needs of all users of streets and highways including motorists, pedestrians, bicyclists, children, person with disabilities, seniors, movers of commercial goods and user of public transportation.
Belmont Pool Revitalization

Re-Issued NOP
Revitalization Initial Study
Notice of Preparation
Initial Study

4000 East Olympic Plaza, Long Beach, CA 90803

Belmont Pool is located in Belmont Shore Beach Park in southeast Long Beach. The existing pool complex is bounded by the beach and the Pacific Ocean to the south, the City’s Beach Maintenance Yard and a large parking lot that provides parking for the beach, Belmont Pool, beach volleyball, Rosie’s Dog Beach, and a boat launch to the southeast, East Olympic Plaza to the north, and the Belmont Veterans Memorial Pier parking lot to the northwest.



Re-NOP
Revitalization IS
NOP
IS
 

The project proposes the demolition of the existing Belmont Pool complex (the indoor and outdoor features) and the construction and operation of a replacement pool complex that includes indoor and outdoor pool components. Spectator seating will be provided for approximately 3,500 people through a combination of permanent and portable seating in the indoor and outdoor areas.

 

California State University Long Beach (CSULB) Foundation Project 

Notice of Preparation

Initial Study

The 9.88-acre (ac) project site is located in the City of Long Beach (City) at the northwest corner of Pacific Coast Highway (PCH) and Cota Avenue. The project site is bounded by the CSULB Foundation’s Regional Technology Center (the Technology Park) and Technology Avenue to the west, 19th Street to the north Cota Avenue to the east, and PCH to the south.

NOP
IS
The project proposes the demolition of the existing buildings and carports on the site, and construction of a new single story building for retail use that would be up to 125,000 sf in size and 486 parking spaces. Figure 2 provides a conceptual site plan for the proposed project. The new retail building would be located on the north half of the site, with parking on the east, south, and west sides of the site. Landscaping, including approximately 123 trees, would be installed on the site. The project building could be used by a single retail tenant or by two retail tenants with separate (side-by-side) entrances.

Drake Park Soccer Field

Notice of Intent to Adopt

Initial Study/ Mitigated Negative Declaration

 

The project site is bound by Loma Vista Drive and single-family residential uses to the southeast and east, a ceramic factory and industrial uses to the south, De Forest Avenue and the Los Angeles River to the west, and existing industrial and commercial uses to the north.

IS The proposed project includes the development of an 8.75 ac new park facility on existing vacant parcels. The proposed project would consist of one striped soccer field, large landscaped open space/passive park areas, a pedestrian walking trail, restroom facilities, and parking (Table 2.2.A). The proposed park would incorporate the existing Loma Vista Park into the new park layout by removing the existing chain-link fencing along the northeastern portions of Loma Vista Park. In addition, the proposed project would use a portion of a City-owned parking lot located near the northwest area of the project site to accommodate the proposed passive park space. The proposed Drake Park Soccer Field Project would be linear in form and would be characterized by an 8 foot (ft) wide pedestrian trail traversing the park from the northeast to southwest. The northeast entrance at Anaheim Street and N. Daisy Avenue is envisioned to be a gateway entrance to the proposed park.
Long Beach Sports Park

Addendum to Final EIR

Willow Springs Master Plan

South of Spring Street, bounded by California Avenue on the West, Orange Avenue on the East, and the Long Beach Municipal and Sunnyside cemetaries on the South.

EIR The project analyzed under this EIR Addendum represents a modification of the previously approved Sports Park project. The original 2006 Final Recirculated EIR for the Sports Park project was certified by the Long Beach City Council on April 18, 2006.
Safran Senior Housing Project 

Notice of Preparation
Initial Study
Final EIR

3215 E. 3rd Street and 304 Obispo Avenue

NOP/IS/EIR The proposed project involves conversion of the building that formerly housed the Immanuel Community Church, located at 3215 E. 3rd Street, into a senior housing project consisting of 24 independent low or very low income senior dwelling units, one manager's unit and associated amenities/common areas in 31,006 square feet of floor area.  The project also involves demolition of the existing single-family hime and detached garage, located at 304 Obispo Avenue, for construction of a surface parking lot to serve this project.  Both properties are located in the Bluff Heights Historic District of Long Beach. 

Urban Village on Long Beach

Mitigated Negative Declaration
1081 Long Beach Boulevard ND The Urban Village on Long Beach project would improve three abutting parcels with a five-story building containing 129 condominium units and 175 parking stalls located within an integrated five-level parking garage. Ground floor features would consist of a single garage ingress/egress off Long Beach Boulevard, an entrance lobby, leasing office, and fitness center, along with resident amenities (lounge, game room, event kitchen, and courtyard), units, and parking stalls. Floors two through five would consist solely of residential units and parking stalls. The building would stand approximately 58 feet above the Long Beach Boulevard grade.
Long Beach Police Dept. Tunnel Project

Mitigated Negative Declaration
400 W. Broadway ND The proposed Long Beach Police Department Tunnel project would provide an in-custody transfer tunnel capable of moving in-custody pedestrians between the existing Police Department and the new State Courthouse currently under construction. An existing in-custody pedestrian transfer tunnel connects the Police Department with the existing State Courthouse located south of the police building. This existing tunnel will no longer be capable of being used when the State Courthouse changes locations in August of 2013 (anticipated date it would be operational).
3801 E. 5th Street

Mitigated Negative Declaration
3801 E. 5th Street ND The property located at 3801 E. Fifth Street was damaged by fire and is currently unsafe and unihabitable. It is a Craftsman bungalow that was constructed in 1920 and is a contributing building within the locally designated Belmont Heights Historic District. The property owner is proposing to restore the building in a historically accurate manner.
Final Downtown Plan

Part 1
Part 2
Part 3
Bounded by Los Angeles River on the west; Ocean Boulevard on the south; generally follows portions of 7th and 10th Streets on the north; and land on both sides of Alamitos Avenue on the east. May be expanded to include 33-acre area south of 10th Street. EIR The project is the adoption and implementation of the proposed Long Beach Downtown Plan (DTP), which would replace the existing PD-30 planned development ordinance for the DTP area. The proposed DTP would incorporate zoning, development standards, and design guidelines to establish design and development criteria to guide new development that would be consistent with the community vision for the Downtown.
2nd + PCH Development Final EIR with Response to Comments

Part 1, Part 2, Part 3 and Part 4; 2nd + PCH 
Recirculated Draft EIR (Appendices available on 5th floor at City Hall)
6400 E. Pacific Coast Hwy. EIR The proposed project would include the demolition of existing on-site uses and would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space.
Downtown Plan

Final EIR Part 1; Final EIR Part 2; Final EIR Part 3Final EIR Part 4; Draft EIR; Appendix A; Appendix B, Part 1, Part 2 and Part 3; Appendix C; Appendix D; Appendix E; Appendix F; Appendix G
Bounded by Los Angeles River on the west; Ocean Boulevard on the south; generally follows portions of 7th and 10th Streets on the north; and land on both sides of Alamitos Avenue on the east. May be expanded to include 33-acre area south of 10th Street. EIR The project is the adoption and implementation of the proposed Long Beach Downtown Plan (DTP), which would replace the existing PD-30 planned development ordinance for the DTP area. The proposed DTP would incorporate zoning, development standards, and design guidelines to establish design and development criteria to guide new development that would be consistent with the community vision for the Downtown.
4201 E. Willow

Mitigated Negative Declaration; Appendix A; Appendix B; Appendix C; Appendix D; Appendix E; Appendix F; Appendix G
4201 E. Willow St. ND The proposed project is a mixed-use development that would include a 9,121 sf retail building and a 4,296 sf automated car wash. There will be 67 parking spaces on site after project implementation, including 14 spaces for the car wash and 53 spaces for the retail uses. The proposed project includes the demolition of portions of the existing dealership, including the service and parts department. Due to the unique architecture and potential historic significance of the existing buildings and features, the project would reuse the entire Ray Vines Chrysler Plymouth Dealership showroom building and the original pole sign.
Long Beach Plastic Carryout Bag Ordinance

Addendum to the Ordinances to Ban Plastic
Carryout Bags in Los Angeles County Final EIR
Citywide EIR The proposed ordinance would ban the issuance of plastic carryout bags and impose a 10 cent charge on the issuance of recyclable paper carryout bags at all supermarkets and other grocery stores, pharmacies, drug stores, convenience stores, foodmarts, and Long Beach farmers markets. The ordinance would require a store to provide or make available to a customer only recyclable paper carryout bags or reusable bags. The ordinance would also encourage a store to educate its staff to promote reusable bags and to post signs encouraging customers to use reusable bags.
2nd + PCH Development

Recirculated Draft EIR
(Appendices available on 5th floor at City Hall)
6400 E. Pacific Coast Hwy. EIR The proposed project would include the demolition of existing on-site uses and would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space.
Pine Square Theater Conversion to Residential

Negative Declaration

250-270 Pacific Avenue

ND

Proposal to convert the theater space from the closed AMC Pine Square 16-screen movie theater into 69 residential apartment units. 112,079 square feet of new residential space, in two levels, will be created from the existing highceilinged one-level theater envelope. The existing 142 residential dwelling units will remain, as well as the existing retail spaces on Pine Avenue, 3rd Street and Broadway. A small amount of floor area from the theater box offices, approximately 538 square feet, will be converted into new commercial retail space, bringing the total leasable retail floor area on-site to 37,240 square feet.

Colorado Lagoon

Final EIR Addendum
SE portion of LB, NW of San Gabriel River mouth, and upstream fr Marine Stadium & Alamitos Bay. EIR The primary goals of the proposed project are to: (1) create habitat that can successfully establish and support native plant and animal communities in the long term, (2) implement long-term water quality control measures, and (3) enhance the Lagoon’s value as a recreational resource. The proposed project provides a framework to coordinate these various and potentially competing interests.
100 E. Ocean Boulevard Acquisition Project

Negative Declaration
100 E. Ocean Boulevard ND 07-10 The proposed project involves acquisition of a privately-owned property at 100 E. Ocean Boulevard by the Long Beach Redevelopment Agency (Redevelopment Agency) for the purpose of land assembly for future development.  Acquisition of the subject property would allow the Redevelopment Agency to improve the physical appearance of the subject property in the short term while encouraging long term redevelopment of the site, as well as improve access to Victory Park.  Physical enhancements may include new signage, fencing and landscaping to improve the aesthetic conditions of the property.  The subject property would be acquired by the Redevelopment Agency through a negotiated agreement, or upon determination by the Redevelopment Agency, by eminent domain.
Oregon Park

Negative Declaration
4951 Oregon Avenue ND 04-10 The City of Long Beach Parks, Recreation and Marine Department intends to develop the 3.3-acre lot with a neighborhood park. Proposed improvements would include a regulation soccer field with lights, a tot lot, group picnic area, walking path and prefabricated restrooms. A total of 42 parking spaces would be added and a portion of the public right of way and Los Angeles flood channel would be landscaped with drought tolerant trees and shrubs.
Aquarium of the Pacific "Pacific Visions" Expansion

Negative Declaration
100 Aquarium Way ND 01-10

The proposed project involves construction of a 23,330-square foot addition (14% floor area increase) to an existing 166,447-square foot aquarium facility. The project consists of a new wing with a “media-based chamber,” an expanded retail store, and a new front entrance. The Aquarium’s total ground lease area is 276,371 square feet (6.34 acres). The project will be designed and built to the USGBC’s LEED Gold standards with “add-alternate” design plans to bring the project to Platinum status if funding is available.

925 East PCH Lease Acquisition Project

Mitigated Negative Declaration
925-945 East Pacific Coast Highway ND

The proposed project involves acquisition of a lease on the Redevelopment Agency-owned property located at 925-945 E. Pacific Coast Highway. The lease, which expires on March 11, 2013, would be acquired by the Redevelopment Agency through negotiated agreement, or upon determination by the Redevelopment Agency, by eminent domain. The project also involves demolition or rehabilitation of the existing project site building for the purposes of blight removal.

Downtown Community Plan

Notice of Preparation
Bounded by Los Angeles River on the west; Ocean Boulevard on the south; 
generally follows portions of 7th and 10th Streets on the north; and land on both sides of Alamitos Avenue on the east. May be expanded to include
33-acre area south of 10th Street.
NOP The project is the adoption and implementation of the proposed Long Beach Downtown Community Plan (DTCP), which would replace the existing PD-30 planned development ordinance for the DTCP area. The proposed DTCP would incorporate zoning, development standards, and design guidelines to establish design and development criteria to guide new development that would be consistent with the community vision for the Downtown.
Historic Preservation Element

Notice of Intent to Adopt

Negative Declaration
Citywide ND This Historic Preservation Element is intended to better integrate historic preservation into City procedures and interdepartmental decisions, and to create a meaningful partnership with the community in order to implement the City’s historic preservation program. As set forth in the Vision Statement, the Historic Preservation Element is intended to ensure that the rich history of Long Beach is preserved through the identification, protection, and celebration of its historic resources which are valued for their role in the City’s environment, urban design, economic prosperity, and contributions to the quality of life in its neighborhoods. The Historic Preservation Element establishes the goals, policies and implementation measures that affirm the City’s commitment to historic preservation.
Golden Shore Master Plan

Final EIR
Bounded by Ocean Blvd. to the N, Shoreline Dr. to the W and S, and parking lots associated with Arco Center to the E, with Golden Shore transecting the site from N to S. EIR The proposed project would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space. The project includes three development options, a Residential Option and two Hotel Options, all of which would be entitled through the City of Long Beach. The option ultimately constructed would be selected based on market conditions prevailing at the time entitlement is complete.
Fresh & Easy Neighborhood Market

Notice of Intent to Adopt

Initial Study
3300 Atlantic Ave. IS

The project site consists of ten lots on 1.38 acres: five located in the City of Long Beach and five in the City of Signal Hill. The five lots located in Long Beach total 30,198 square feet and are located on the east side of Atlantic Avenue and north of East 33rd Street at 3300 Atlantic Avenue. The applicant is proposing to construct a new single-story, 14,304 square-foot Fresh & Easy Neighborhood Market with 17 parking spaces north of the building on the .69-acre Long Beach site. Two accessory parking lots, separated from the market by a 20’ wide alley and containing a total of 52 parking stalls, comprise the remaining project acreage and lie within the City of Signal Hill. The lots in Signal Hill consist of a 100’ wide x 120’ deep parcel and a 150’ wide x 120’ deep parcel separated by 100’. Both of these lots will be improved as open parking lots for the retail use. The parking lots also contain a trash enclosure, transformer, and cart corral.

Studebaker LB, LLC Tank Removal Project

Notice of Intent to Adopt

Revised Mitigated Negative Declaration 
400 N. Studebaker Rd. ND The project site is a nearly rectangular shaped 17.8 acre parcel located on the east side of Studebaker Road at the Loynes Drive/Studebaker Road intersection. The project site contains six above-ground storage tanks (ASTs), conveyance pipelines, and containment berms. The four large ASTs (tanks Nos. 1,2,3,4) originally stored Fuel Oil No. 6, which formerly fueled the adjacent power plant. The remaining smaller ASTs (cutter tank Nos. 1 and 2) have been used to store distilled oil. The tanks are surrounded by a berm system originally constructed to contain any tank spills. There are no existing occupants or land uses on the site.
Ramona Park Senior Apartments

Negative Declaration 

Historic Resource Assessment
Part 1, Part 2, Part 3, Part 4, Part 5 and Part 6
3290 and 3232 Artesia Blvd. ND The proposed project is an affordable senior apartment complex for seniors 55 years and older. The proposed three-story building will consist of 61 residential units, including 49 one-bedroom units, 11 two-bedroom units, and one three-bedroom managers unit. Amenities will include a large central courtyard, a pool, spa, fire pit, picnic area, exercise room, community rooms, classroom and recreation rooms. A second parcel, APN#7120-003-033, is included in the project and currently exhibits the Windsor Gardens Convalescent Center at 3232 East Artesia. This parcel will only undergo a general plan amendment and zone change as part of the proposed project.
Art Exchange

Draft EIR 

Appendices
Part 1Part 2, Part 3 & Part 4
240-256 Long Beach Blvd. EIR The Art Exchange is intended to provide a permanent and affordable workplace for the development and production of art by local artists.  The Exchange would operate on a profit-centered business model where artists sell directly to the public and are connected to networking opportunities that would help promote an art community for the City.  Project components include artist studios, multipurpose/classroom space, hot shop for glass and ceramics production, a centrally located open courtyard, gallery space, office, and service areas.
Studebaker LB, LLC Tank Removal Project

Mitigated Negative Declaration
400 N. Studebaker Rd. ND The project site is a nearly rectangular shaped 17.8 acre parcel located on the east side of Studebaker Road at the Loynes Drive/Studebaker Road intersection. The project site contains six above-ground storage tanks (ASTs), conveyance pipelines, and containment berms. The four large ASTs (tanks Nos. 1,2,3,4) originally stored Fuel Oil No. 6, which formerly fueled the adjacent power plant. The remaining smaller ASTs (cutter tank Nos. 1 and 2) have been used to store distilled oil. The tanks are surrounded by a berm system originally constructed to contain any tank spills. There are no existing occupants or land uses on the site.
Golden Shore Master Plan

Draft EIR
Bounded by Ocean Blvd. to the N, Shoreline Dr. to the W and S, and parking lots associated with Arco Center to the E, with Golden Shore transecting the site from N to S. EIR

The proposed project would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space. The project includes three development options, a Residential Option and two Hotel Options, all of which would be entitled through the City of Long Beach. The option ultimately constructed would be selected based on market conditions prevailing at the time entitlement is complete.

Alamitos Bay Marina 

Final EIR
SE portion of LA County within City of Long Beach. Adjacent and NW of San Gabriel River mouth. EIR The City is the Lead Agency for the project and will prepare the EIR in accordance with the requirements of CEQA and the State CEQA Guidelines. In early 2008, the City prepared an Initial Study/Mitigated Negative Declaration (IS/MND) for the Alamitos Bay Marina Rehabilitation Project. Mitigation measures to reduce potentially significant effects to less than significant levels were incorporated into the project, and the IS/MND was circulated for public review from April 4, 2008 to May 5, 2008. Comments were received from reviewing agencies and issues were raised in the comments received that have yet to be resolved. Therefore, due to and abundance of caution, the City has elected to elevate the level of CEQA review to an EIR.
Second + PCH

Notice of Preparation, Initial Study 

Scoping Meeting Presentation

Southeast corner of Second Street and Pacific Coast Highway

NOP/IS

The proposed project would include the demolition of existing on-site uses and would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space.

Bahia Marina 6289 E. Pacific Coast Highway ND 08-09 The proposed project involves maintenance dredging for the Cerritos Bahia Marina to maintain sufficient water depth for marina operations.  The proposed dredge depth for the project is –6 feet mean lower low water (mllw) with an allowable over dredge of +2 feet.  The volume of material to be removed is 26,867 cubic yards (cy).  A volume of 11,086 cy is available to –6 feet (mllw) and 15,781 cy is available in the +2 foot over dredge volume.
North Village Center

Final EIR

Draft EIR Part 1, Part 2, Part 3, and Part 4

Appendix Part 1, Part 2, Part 3, and Part 4
Bounded by South St., Linden Ave., 59th St., and Lime Ave. EIR 01-08

The proposed project involves the redevelopment of an approximately 6.3-acre site in the City of Long Beach with a mixed-use “village center” project. This section describes the project location, characteristics of the site and the proposed development, project objectives, and the approvals needed to implement the project.

Kroc Community Center

Final EIR

Findings of Fact & Statement of Overriding Considerations

Mitigation Monitoring Program
Hamilton Bowl / Chittick Field, 1900 Walnut Ave. Final EIR The reformation of up to 19 acres of land designated by the Salvation Army, through a grant from the Kroc Foundation, for the location of a new recreation and community center to foster and serve the recreational needs of the local community.
Art Exchange 240-256 Long Beach Blvd. EIR 02-09

The Art Exchange is intended to provide a permanent and affordable workplace for the development and production of art by local artists. The Exchange would operate on a profit-centered business model where artists sell directly to the public and are connected to networking opportunities that would help promote an art community for the City.

Hotel Sierra 290 Bay Street EIR 01-09

This is an addendum to the Supplemental EIR 14-04 for the Pike at Rainbow Harbor project. This project consists of a new 5-story 125-room hotel with approximately 15,000 square feet of ground floor retail space, to be located at 290 Bay Street. Parking is to be provided at the 2,211-space Pike parking structure.

Alamitos Bay Marina SE portion of LA county within City of LB. Adjacent and NW of San Gabriel River mouth. NOP The City is the Lead Agency for the project and will prepare the EIR in accordance with the requirements of CEQA and the State CEQA Guidelines. In early 2008, the City prepared an Initial Study/Mitigated Negative Declaration (IS/MND) for the Alamitos Bay Marina Rehabilitation Project. Mitigation measures to reduce potentially significant effects to less than significant levels were incorporated into the project, and the IS/MND was circulated for public review from April 4, 2008 to May 5, 2008. Comments were received from reviewing agencies and issues were raised in the comments received that have yet to be resolved. Therefore, due to and abundance of caution, the City has elected to elevate the level of CEQA review to an EIR.
Kroc Community Center 

Volume 1:
Part 1, Part 2, Part 3,  
Part 4
Volume 2: Part 1, Part 2, Part 3,
Part 4
Hamilton Bowl / Chittick Field, 1900 Walnut Ave. Draft EIR The reformation of up to 19 acres of land designated by the Salvation Army, through a grant from the Kroc Foundation, for the location of a new recreation and community center to foster and serve the recreational needs of the local community.
1235 Long Beach Blvd. Mixed-Use Project S of Anaheim St. & N of 12th St., between Locust Ave. & Long Beach Blvd. Addendum The proposed project would include demolition of existing on-site uses and construction of a mixed-use (transit oriented) development that includes the construction of 3 buildings consisting of 170 residential condominium units, 186 senior (age-restricted) apartment units, and 42,000 sq. ft. of retail/restaurant floor area.
Golden Shore Master Plan Bounded by Ocean Blvd. to the N, Shoreline Dr. to the W and S, and parking lots associated with Arco Center to the E, with Golden Shore transecting the site from N to S. NOP The proposed project would provide new residential, office, retail, and potential hotel uses, along with associated parking and open space. The project includes two development options, a Residential Option and a Hotel Option, both of which would be entitled through the City of Long Beach. However, only one option would be ultimately constructed based on market conditions prevailing at the time entitlement is complete.
Colorado Lagoon Restoration Project Final EIR SE portion of LB, NW of San Gabriel River mouth, and upstream fr Marine Stadium & Alamitos Bay. EIR 30-07 The primary goals of the proposed project are to: (1) create habitat that can successfully establish and support native plant and animal communities in the long term, (2) implement long-term water quality control measures, and (3) enhance the Lagoon’s value as a recreational resource. The proposed project provides a framework to coordinate these various and potentially competing interests.
Douglas Park Rezone Project

Addendum to Final EIR
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
CEQA Findings
Douglas Park Rezone Project Appendix A - Air Quality
Appendix B - Drainage
Appendix C - SUSMP
Appendix D - Reclaimed Water
Appendix E - Sewer Technical Study
Appendix F - Traffic Memoranda
Appendix G - FAA Determinations
CEQA Findings and MMRP
North Village Center Redevelopment Project

Notice of Preparation
Initial Study
2 full blocks on the E & W sides of Atlantic, N of South St. NOP/IS Construction of up to 180 units of multi-family housing in a mix of row houses, courtyard units and units built atop ground floor non-residential space. The project also includes up to 50,000 sq. ft. of neighborhood-serving commercial/retail space, a public library and community center totaling approximately 30,000 sq. ft., and approximately 600 off-street parking spaces in private garages, surface parking lots and an above-ground parking structure.
Rancho Dominguez Annexation Rancho Dominguez Industrial Area ND 18-06 Annexation of approx. 880 acres of the unincorporated LA County Rancho Dominguez area, which is generally bounded by Alameda St. on the west, the 91 fwy. on the north, the City of LB corporate boundary on the east and Del Amo Blvd. on the south. The industrially developed acreage contains approx. 189 structures on 279 parcels of land.
Ocean Blvd. Project 1628-1724 Ocean Blvd.
ND 10-09
The proposed project would include the demolition of existing structures, the development of 51 condominium units and the remodel of an existing building to maintain 11 motel units.  The residential development would be four stories in height above street level and would have two levels of subterranean parking.  Vehicular access to the subterranean garage would be from 11th Place and Bluff Place.  The demolition and construction activities are estimated to take approximately 18 months from commencement of work.
Aquarium of the Pacific Facility Enhancement Project

Part 1 & Part 2
100 Aquarium Way ND 14-06 The Aquarium of the Pacific proposes (1) to construct 5,300 sq. ft. of LEED Platinum-certified indoor facilities & 13,800 sq. ft. of outdoor, fabric-shaded exhibit area at the rear of its existing campus ("proposed South Lease area") and (2) to relocate its current aviary exhibit to the same parcel.